All ready for the flow screed (finished floor) tomorrow! Things are really moving now.... The 600 metres of ground piping were put in 1 metre underground by Dick Baines and his boys some time ago. They will transfer the heat from the ground into the pipes under the floor in the barn to provide heating and the hot water. . The idea is that for every unit of electricity used to pump the heat, 3-4 units of heat will be produced making it an efficient way to heat the building......we will see. Martin Dowd and his team at MG Renewables have waited a long time for this to happen. The 200 litre cylinder is just waiting to be connected.
Thursday, 12 June 2014
Ground source heating pipes are in!
All ready for the flow screed (finished floor) tomorrow! Things are really moving now.... The 600 metres of ground piping were put in 1 metre underground by Dick Baines and his boys some time ago. They will transfer the heat from the ground into the pipes under the floor in the barn to provide heating and the hot water. . The idea is that for every unit of electricity used to pump the heat, 3-4 units of heat will be produced making it an efficient way to heat the building......we will see. Martin Dowd and his team at MG Renewables have waited a long time for this to happen. The 200 litre cylinder is just waiting to be connected.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment