Monday, 11 March 2013

TEMPORARY MOTHBALLING

We are putting the barns project on hold for a while.  Looking forward to getting going again really soon.  Awaiting the sale of Ewerby - let's hope it's not too long a wait.

Keep checking in as I will be posting garden photos as it begins to come to life in the spring and summer

Wednesday, 30 January 2013

Kitchen


The stable door that will eventually be here is still at the design stage.  This is a very wide door and we are just trying to get it right.  So, in the meantime it is boarded up!

En suite!

The beginnings of the wiring for the cupboard space in the upstairs en suite......We are having the washing machine, tumble dryer, ironing board etc upstairs. 

Pointing in Library

All Del's work!  This is the inside wall of the library - light on the right shining through today!

Steps and pipes

This tiny area of the whole development has caused more headaches than anything else!  At last we have decided to chop away a part of it so that the finished floor level doesn't stand above the window base.  This way, only the very first section (nearest) will be a different level and the curtains will have to be cut accordingly.  The structure to the right of the picture is the en suite to this bedroom.  It was actually have a large shower rather than a bath.   Lovely room this one is going to be.....the room with the view!

Friday, 18 January 2013


Only wish I had a sledge or an oven tray up there - would have been fun!